1. Freeze the reporting period
Record the month, contracts and SINs in scope. Keep a snapshot of the source export and document any late adjustments that will be handled in a later period.
2. Confirm the field map
Do not rely on memory. Maintain a controlled map from accounting or order-system fields to the current reporting fields, including dates, identifiers, quantities, prices, credits and zero-sales logic.
3. Reconcile the population
Tie reportable rows and totals to the source ledger. Investigate duplicates, voids, returns, credits, missing contract identifiers and transactions posted near the month boundary.
4. Resolve exceptions before formatting
A clean spreadsheet is not evidence of a correct population. Route commercial and contract questions to the responsible person and record the decision.
5. Validate the upload draft
Check required fields, types, date formats, numeric values, row counts and totals. Preserve the exact draft that was reviewed.
6. Separate preparation from certification
The contractor’s authorized POC should access SRP, review the packet, upload and certify. Preparation support should not require the POC’s MFA credentials.
7. Retain a monthly evidence packet
Store the source hash, mapping version, exception register, reconciliation, upload draft, submission result and any later correction.
Release test
Before the artifact is released, ask four questions: Can every material value be traced to a source? Are unresolved facts still visible? Was the exact release candidate rechecked? Does the final claim stay inside the evidence?
Questions teams ask
Treating the upload template as the process. The real control is the source-to-submission reconciliation.
Yes, but only as a controlled baseline. Contract, source-system and reporting changes should trigger review.
Anything not resolved by a deterministic rule: contract scope, credit treatment, missing identifiers, unusual dates or unsupported values.